Plastering about us contact us information on products email plastering and drylining Home page plastering and drylining
 
     
  Metal stud partitions section

70mm metal stud partition with placed between vertical studs. Facings of plasterboard each side, in either single or multiple layers.

The use of resilient channels to one side of the metal stud partition will enhance acoustic insulation values
. With the use of tapered edge plasterboard the metal stud partition can be finished by taping and jointing or a multi finish plaster.

In a new house build the walls can then be dry lined with a technique knows as dot and dab. The most common form of dot and dab is a 12.5 mm plasterboard fixed to the wall with drywall adhesive, dot and dab is a good system to use when drying times are important to your contract and as with the metal stud partition can made ready for taping and jointing or plastering.


Mf ceilings are also very versatile allowing for great design imagination, similar to the metal stud partitions the are quick to install and offer great flexibility. Mf ceilings allow for services to be install above the metal frame grid and then usually in a second visit plaster boarded, the Mf ceilings can be finished the same as the partition with taping and jointing or plaster skim coat

If you contract requires unusual and great detail Mf ceilings would be our recommended choice and as a company we specialize in Mf coffered ceilings and Mf bulkhead details.





 
metal stud partition detail
 
   
Copyright 2007 serendipity investments ltd
Telephone 01403 251792
Shirburn House 98 Billingshurst Road , Broadbridge Heath West Sussex RH12 3LP